Head phones with long lead (Alverstoke PO12)
Black, about 10" (300cm) lead. Good Quality Sennheiser HD 201. Gives a really good quality sound. Sponge ear covering a little decayed.
Collection Times
Anytime
Anytime
To reply to this post, please log in or sign up.