Job lot of floor tiling equipment (DE72)

Here is the equipment I have left from a floor tiling job. It includes:

Spacers (only used 10)
Concrete floor levelling primer (3/4 remaining)
Wall hole/crack filler (1/4 tub left)
Floor sealer before using tile adhesive (3/4)
Floor levelling mix (1/2 bag)
Plaster board tape

Fair Offer Policy applies
Collection Times
Anytime