MOT type 1 (sub base for driveways, sheds, pathways (Townsend AL3)
Left over from driveway project, there is possibly as much as 1 tonne. Would like it collected as soon as possible, happy for it to go in multiple lots.
To reply to this post, please log in or sign up.