A Members' Posts

List Layout
Photo List Layout
Cards Layout
Offers   Requests
Free: Laminated number names (Childwall L16) Numbers to 20. Number names with shapes as in photo. Each card is A5 size. Made and used in a school.
Photo of free Laminated number names (Childwall L16) #1
Free: Plastic shapes (Childwall L16) See photo. Colourful plastic shapes for sorting or drawing around. Each measures approximately 2-3 cms.
Photo of free Plastic shapes (Childwall L16) #1
Free: Set of laminated numbers (Childwall L16) A5 size. These were made and used in a school originally.
Photo of free Set of laminated numbers (Childwall L16) #1
Free: Shaving mirror (Childwall L16) Gifted Good condition. Has a magnifying side. Mirror measures approximately 17cms in diameter.
Photo of free Shaving mirror (Childwall L16) #1
Free: Birthday Candle holders (Childwall L16) A number of small birthday candle holders as in photo . Used but good condition.
Photo of free Birthday Candle holders (Childwall L16) #1
Free: Coloured in Pokémon pictures (Childwall L16) Two large thick cardboard Pokémon pictures originally coloured in by my son about 20 years ago! Each measures approximately 50cms (20”) x 38cms (15”). Good condition for their age!
Photo of free Coloured in Pokémon pictures (Childwall L16) #1
Free: Coloured in Lion King picture (Childwall L16) Large thick cardboard Lion King picture. Coloured in by my son about 20 years ago! Measures approximately 50cms (20”) x 38cms (15”).
Photo of free Coloured in Lion King picture (Childwall L16) #1
Free: fridge wine rack (Childwall L16) As in photos. Measures 46cms (just over 18”) x 30.5 cms (12”). Make sure measurements fit as just too wide (half a centimetre!) for my new fridge.
Photo of free fridge wine rack (Childwall L16) #1
Photo of free fridge wine rack (Childwall L16) #2
Photo of free fridge wine rack (Childwall L16) #3
+1
Free: Double duvet and pillowcases (Childwall L16) Gifted Double duvet as in photos (see all 3 photos) with 2 pillow cases. This is 100% polyester fabric with a zip fastening. Only used a couple of times as we didn’t like the polyester fabric. Measures 200cm x 200cm.
Photo of free Double duvet and pillowcases (Childwall L16) #1
Photo of free Double duvet and pillowcases (Childwall L16) #2
Photo of free Double duvet and pillowcases (Childwall L16) #3
+1
Free: Silver and white shower curtain (Childwall L16) Gifted Clean and washed. A bit discoloured at the bottom but other than that, good condition.
Photo of free Silver and white shower curtain (Childwall L16) #1
Free: Shower curtain (Childwall L16) Gifted Butterfly design. I little discoloured at the bottom but washed and clean.
Photo of free Shower curtain (Childwall L16) #1
Free: Take That CD (Childwall L16) Gifted CD ‘The Circus’. As in photos. See second photo for contents.
Photo of free Take That CD (Childwall L16) #1
Photo of free Take That CD (Childwall L16) #2
Free: Various bulbs (Childwall L16) Gifted A number of different bulbs as in photo. Been in a drawer for a while but all are not used.
Photo of free Various bulbs (Childwall L16) #1
Free: Old tennis racket press (Childwall L16) Old but will still work. Keeps a tennis racket in shape.
Photo of free Old tennis racket press (Childwall L16) #1
Free: White shower curtain (Childwall L16) Gifted As in photo. Used but good condition. Clean and washed.
Photo of free White shower curtain (Childwall L16) #1
Free: Carpet grippers (Childwall L16) Gifted 5 lengths of carpet grippers. New. Each measures 1.52m.
Photo of free Carpet grippers (Childwall L16) #1
Photo of free Carpet grippers (Childwall L16) #2
Free: Various CDs (Childwall L16) Withdrawn Selection of CDs as in photo.
Photo of free Various CDs (Childwall L16) #1
Free: Razor (Childwall L16) Gifted See photos. No charging lead but maybe pick one up from internet. Used, just needs a good clean. Freegling for a relative so can’t really give anymore information.
Photo of free Razor (Childwall L16) #1
Photo of free Razor (Childwall L16) #2
Photo of free Razor (Childwall L16) #3
Photo of free Razor (Childwall L16) #4
+2 +1
Free: Model planes magazines (Childwall L16) Withdrawn As in photos. Three magazines from 1980.
Photo of free Model planes magazines (Childwall L16) #1
Photo of free Model planes magazines (Childwall L16) #2
Free: Frank Sinatra biography (Childwall L16) Gifted Hardback book. A thick book with 570 pages. Great for a Frank Sinatra fan.
Photo of free Frank Sinatra biography (Childwall L16) #1
Photo of free Frank Sinatra biography (Childwall L16) #2
Free: Elvis Presley biography (Childwall L16) Gifted Concentrating on years 1948-1958. Thick paperback book of 578 pages. Excellent condition. Brilliant for Elvis Presley fans.
Photo of free Elvis Presley biography (Childwall L16) #1
Photo of free Elvis Presley biography (Childwall L16) #2
Free: Homemade radio box (Childwall L16) Gifted See other photos. Incorporating an old car radio. Would be of interest to someone who knows about electronics? Outer wooden case measures approximately 23cms wide x 22 cms x 21 cms. Good condition on the outside but can’t comment on anything else!
Photo of free Homemade radio box (Childwall L16) #1
Photo of free Homemade radio box (Childwall L16) #2
Photo of free Homemade radio box (Childwall L16) #3
Photo of free Homemade radio box (Childwall L16) #4
+2 +1
Free: Large grey curtains (Childwall L16) Withdrawn Large grey pencil pleat curtains each measures 167cms (66”) wide x 228cms (90”) drop. Faded a bit but still good to hang up. Back of curtains is discoloured a bit as I washed them at one point and it says dry clean only, but they still look ok when hung up.
Photo of free Large grey curtains (Childwall L16) #1
Photo of free Large grey curtains (Childwall L16) #2
Photo of free Large grey curtains (Childwall L16) #3
+1
Free: Dog water bottle (Childwall L16) Gifted New. Never used.
Photo of free Dog water bottle (Childwall L16) #1
Free: Radio control info books (Childwall L16) Withdrawn A selection of books and magazines about radio control aeroplane models. These are dated around 1973-1980.
Photo of free Radio control info books (Childwall L16) #1
Free: Screwdrivers (Childwall L16) Gifted A number of old screwdrivers as in photo.
Photo of free Screwdrivers (Childwall L16) #1
Free: Pair of +2.00 reading glasses (Childwall L16) Withdrawn As in photo. One pair of +2.00 reading glasses.
Photo of free Pair of +2.00 reading glasses (Childwall L16) #1
Free: 60’s CD (Childwall L16) Withdrawn As in photos. Free from the Daily Express quite a few years ago now!
Photo of free 60’s CD (Childwall L16) #1
Photo of free 60’s CD (Childwall L16) #2
Free: Music Score (Childwall L16) Gifted See photos. Small score for Stravinsky’s ‘The Soldier’s Tale’. Used when studying music at college. 68 pages long.
Photo of free Music Score (Childwall L16) #1
Photo of free Music Score (Childwall L16) #2
Photo of free Music Score (Childwall L16) #3
+1
Free: Plastic bags (Childwall L16) Gifted These bags measure approximately 35cms x 23cms. Some have been used. They are not food bags and the resealable part does not work but they can be used for just keeping things in. 19 bags.
Photo of free Plastic bags (Childwall L16) #1