Trash Nothing
  •  Give 
  • or
  •  Browse 
  • items
Trash Nothing
  • Search Trash Nothing
  •  New Post
  • Log in or Sign up
    • Log in
    • Sign up
  • Log in
  • Sign up
 

Extension box with very long lead (Stevenage SG1)

Request
1 hr ago
      View map
Please if anyone have got an extension box with very long lead they will like to rehome, please i am interested.
I live in Stevenage and can pick from neighbouring towns.

Thank you 🙏
Can you help with this request?
To reply to this post, please log in or sign up.
   
       
Posted by
Member for 1 year
1 Offer / 15 Requests
Supporter
  • Request: Small Shelf/display unit/Cabinet (Stevenage SG1)
    25d
  • Request: Bird feeding station and bird bath (Stevenage SG1)
    +1
    51d
  • Request: Power bank (Stevenage SG1)
    78d
  • Request: Food Dehydrator (Stevenage SG1)
    78d
  • Request: Dominoes game (Stevenage SG1)
    78d
  • Request: Small Shelf/display unit/Cabinet (Stevenage SG1)
    25d
  • Request: Bird feeding station and bird bath (Stevenage SG1)
    +1
    51d
  • Request: Power bank (Stevenage SG1)
    78d
  • Request: Food Dehydrator (Stevenage SG1)
    78d
  • Request: Dominoes game (Stevenage SG1)
    78d
Approximate Location         Show marker
Home Help Terms Privacy Stories Events Blog Locations Developers Volunteers Free Stuff Guides Credits